Factsheet: Small scale grid connection RD 1699/2011

Small scale grid connection RD 1699/2011

Key Information
Description: 
RD 1699/2011 establishes the basic administrative conditions, contractual, economic and technical for the connection of small-scale power plants to the electricity distribution network
Goal/Aim: 
Stimulate electricity generation from small-scale plants and regulate their connection to the grid

Sector/Topic targeted:

Status: